Orange County NC Website
<br />WINDOWS: <br />1. Install vinyl replacement windows and trim in the <br />living room, left rear bedroom and the rear addition. <br />EXTERIOR SURFACES: <br />1. Paint all surfaces not covered by vinyl siding or <br />Aluminum trim with exterior latex paint. Paint to cover <br />completely. <br />INTERIOR PAIlVT: <br />1. Paint all interior wall surfaces with flat latex paint, the <br />ceilings with ceiling white and the trim, bath and kitchen with <br />semigloss latex. Paint to cover completely. Do not paint any <br />paneling. <br />LIVING ROOM: <br />1. Remove the existing door. Install a 3-0 metal insulated <br />door unit with weather stripping and threshold. Install a lockset <br />and deadbolt to be keyed the same. Install a peephole, matching <br />interior trim and a door bump. <br />2. Install an aluminum clad storm door, with pneumatic <br />closure and vinyl sweep. <br />3. Remove the floor covering to expose 6 floor joists. <br />4. Replace 5 floor joists with likesize lumber. <br />5. Replace 10 l.f. of sill with pressure treated lumber. <br />6. Replace 10 l.f. of plate with pressure treated lumber. <br />7. Install likesized plywood and trim to match the existing. <br />8. Install carpet and pad. Carpet allowance to be $14/yd. <br />FRONT/RIGIiT BEDROOM: <br />2 <br />