Browse
Search
Agenda - 01-19-1999 - 8h
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1999
>
Agenda - 01-19-1999
>
Agenda - 01-19-1999 - 8h
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2009 4:12:23 PM
Creation date
7/17/2009 4:12:22 PM
Metadata
Fields
Template:
BOCC
Date
1/19/1999
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8h
Document Relationships
1999 NS Housing - Housing Rehabilitation Contract Award
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\1990's\1999
Minutes - 19990119
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Phebe English <br />215 Sanders Rd <br />Efland, NC 27243 <br />563-6795 <br />2/2/98 <br />EXTERIOR: <br />1. Remove the gable window. <br />- 2. Install a crawl space. access door on the right rear of <br />the house. Door to be door of pressure treated lumber with <br />galvanized locking hasp and hinges. <br />3. Install three gable vents. <br />4. Close all holes in the foundation with block and mortar. <br />5. Install vinyl siding and trim. Install aluminum fascia <br />and soffitt. Install aluminum door and window trim. Extend <br />window trim as necessary for proper installation of aluminum <br />trim and siding. Install siding and trim on the porch ceiling. <br />ROOF: <br />1. Remove the roof covering to the sheathing. Install 151b. <br />felt, aluminum drip edge and three tab shingles on the front <br />side only. Flash and counter flash the chimneys. <br />2. Reframe the gable overhangs to accommodate a 6 <br />inch soffitt. Install sheathing to match the existing. <br />3. Install new fascia on the new barge rafters <br />3. Prepare the rear sections of the roof for a rubberized <br />roof system. Install 3/a" insulation board a rubberized roof <br />system and all required flashing. <br />GUTTER AND DOWNSPOUTS: <br />1. Install aluminum, continuous gutter and downspouts. <br />Install concrete splashblocks under each downspout. <br />
The URL can be used to link to this page
Your browser does not support the video tag.