Browse
Search
Agenda - 02-09-1999 - 1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1999
>
Agenda - 02-09-1999
>
Agenda - 02-09-1999 - 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/7/2015 9:50:59 AM
Creation date
7/15/2009 11:59:23 AM
Metadata
Fields
Template:
BOCC
Date
2/9/1999
Meeting Type
Work Session
Document Type
Agenda
Agenda Item
1
Document Relationships
Minutes - 19990209
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Core of the Harris Reactor <br />• 157 PWR fuel assemblies <br />• Center - center distance of 8.5 inches <br />Present and Proposed Capacity of <br />the Harris Fuel Pools <br />Pool <br />PWR spaces <br />BWR spaces <br />Total <br />`A' <br />360 <br />363 <br />723 <br />`B' <br />768 <br />2178 <br />2946 <br />`C' <br />927 <br />2763 <br />3690 <br />`D' <br />1025 <br />0 <br />1025 <br />Total <br />3080 <br />5304 <br />8384 <br />• Pools A and B now have licensed capacity as <br />listed. <br />• Pools C and D will acquire the listed capacity <br />in five stages. <br />• Center- center distance in pools A and B is <br />10.5 inches for PWR fuel and 6.25 inches for <br />BWR fuel. <br />• Center - center distance in pools C and D will <br />be 9.0 inches for PWR fuel and 6.25 inches <br />for BWR fuel. <br />page 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.