Orange County NC Website
Core of the Harris Reactor <br />• 157 PWR fuel assemblies <br />• Center - center distance of 8.5 inches <br />Present and Proposed Capacity of <br />the Harris Fuel Pools <br />Pool <br />PWR spaces <br />BWR spaces <br />Total <br />`A' <br />360 <br />363 <br />723 <br />`B' <br />768 <br />2178 <br />2946 <br />`C' <br />927 <br />2763 <br />3690 <br />`D' <br />1025 <br />0 <br />1025 <br />Total <br />3080 <br />5304 <br />8384 <br />• Pools A and B now have licensed capacity as <br />listed. <br />• Pools C and D will acquire the listed capacity <br />in five stages. <br />• Center- center distance in pools A and B is <br />10.5 inches for PWR fuel and 6.25 inches for <br />BWR fuel. <br />• Center - center distance in pools C and D will <br />be 9.0 inches for PWR fuel and 6.25 inches <br />for BWR fuel. <br />page 8 <br />