Orange County NC Website
14 <br />Barrows suggested that the Planning Board come to a decision and have the <br />applicants work with the Planning Staff to accomplish the suggestion made <br />by Woods. <br />MOTION: Andrews moved approval as recommended by the Planning Staff. <br />Seconded by McAdams. <br />VOTE: Unanimous. <br />Barrows encouraged the applicants to confer with the Planning Staff at their <br />earliest convenience for further assistance. <br />b. Preliminary Plans <br />(1) High Point Woods Phase III <br />Presentation by Jim Hinkley. <br />The current Phase III Preliminary Plan presented herein is a modification of <br />the Concept Plan approved by the Planning Board on August 5, 1998. The <br />developer has opted to remove from the Phase III plat the 10 -acre lot lying <br />immediately to the west of proposed lot 3 and not to create three lots from <br />the two existing lots along the southeastern side of Sparrow Hawk Crest. <br />The proposed four -lot High Point Woods, Phase III major subdivision is <br />located in the northwest comer of Chapel Hill Township. It will be <br />accessed from the south side of Ode Turner Road (SR 1130) via Sparrow <br />Hawk Crest Road, a Class A private road. All four lots will be served by <br />Wood Thrush Lane (Class B) which extends from Sparrow Hawk Crest <br />Road. One lot (IA) is also accessed by Red Tail Hawk Road (Class C) <br />which also extends from Sparrow Hawk Crest Road. Ode Turner Road <br />intersects 5,700 feet to the north with Orange Grove Road and 2, 250 feet to <br />the south with Davis Road. <br />The proposed subdivision includes 20.04 acres. Four lots are proposed to <br />be created from two existing 10 -acre parcels of record. One 10.01 acre <br />parcel (Tax Map No. 7.1..21) will be divided into a 7.01 acre and a 3 acre <br />lot, and the other 10.03 acre parcel (Tax Map No. 7.1..21G) will be divided <br />into a 7.01 acre lot and a 3.02 acre lot. <br />The southern two- thirds of the subdivision is located in the U- ENO-PW <br />Upper Eno Protected Watershed. The upper one -third is undesignated. <br />Impervious surface limitations in the U- ENO -PW are 12 percent for <br />existing and new lots outside Transition Areas as designated in the Land <br />Use Element of the Comprehensive Plan. BMP's (Best Management <br />Practices) cannot be used to satisfy watershed requirements. <br />A 150' Duke Power transmission line easement crosses the extreme <br />northerly end of Lot 3. A type D 50' land use buffer runs along the <br />southern edge of the power easement. A Type D Buffer is composed of 50- <br />75% evergreen vegetation distributed so as to create a semi - opaque screen <br />to a height of at least 30'. (Section 12.6.1 Standards for Required Buffers, <br />Orange County Zoning Ordinance. <br />