Orange County NC Website
8 <br />latex paint. Paint to cover completely. Insta112 coats <br />of polyurethane on the doors. <br />FLOOR COVERING: <br />1. Install carpet and pad in all rooms but the bath. <br />Carpet allowance to be $14/yd. <br />2. Install roll vinyl floor covering in the bath. Vinyl <br />allowance to be $14/yd. Install shoemold and metal <br />Trim. <br />FRONT ENTRANCE: <br />1. Replace 1 stair tred, stain and varnish. <br />2. Stain and insta112 coats of polyurethane on the <br />treds and risers. <br />REAR NTRANCE: <br />1. Remove the existing -door and storm door. Install a <br />six panel, metal insulated door unit. Install lockset and <br />deadbolt to be keyed the same. Install peephole and <br />matching interior trim. <br />2. Install an alununum clad storm door with pneumatic <br />closure and vinyl sweep. <br />3. Repair the existing sheetrock. <br />4. Remove the framing and paneling partition. <br />Remove the cabinets. Repair any areas disturbed <br />by this operation. <br />5. Prepare the floor for vinyl. Install vinyl floor <br />covering over the existing floor. <br />5 <br />