Orange County NC Website
6 ` <br />HALL: <br />1. Replace the left side door casing to the hall door. <br />2. Repair the baseboard on the left side of the hall. <br />3. Repair the sheetrock over the door <br />BATH: <br />1. Remove the wall and ceiling covering to the studs, <br />block wall and, ceiling joists. Fur the block wall with <br />3/a furring strips. Insulate the exterior-wall <br />with 3/a inch foam insulation. <br />2. Install MR sheetrock on the walls. Install 'h inch <br />sheetrock on the ceiling. Tape and finish the sheetrock <br />smooth. <br />3. Install a plastic tub enclosurer the with comer shelves <br />4. Install a five piece accessory kit. <br />5. Install new casing on the bath door and window. <br />6. Install matching baseboard. <br />7. Install a medicine cabinet. <br />PLUMBING: <br />1. Install a handicap commode. Install new supply line <br />and cutoff. <br />2. Install washerless faucets on the lavatory. Install new <br />supply lines, cutoffs and P-trap assembly. <br />3 <br />