Orange County NC Website
5 <br />ROOF: <br />1. Remove the existing roof to the sheathing. Install <br />15 lb. felt, aluminum drip edge and three tab shingles. <br />Install a ridge vent ventilation system. <br />2 Insta112, 12x 18 gable vents. <br />INTERIOR: <br />DOWNSTAIRS APARTMENT: <br />INTERIOR PAINT: <br />1. Prepare all surfaces for paint.Paint the walls with <br />flat latex paint, the ceilings with ceiling white latex paint <br />and the trim, bath and kitchen with semigloss latex paint. <br />paint to cover completely. Install 2 coats of poyurethane on <br />the doors. <br />FLOOR COVERING: <br />1. Prepare the floor for vinyl. Install roll, vinyl floor <br />covering, metal trim and shoemold. Vinyl allowance to <br />be $14/yd. <br />KITCHEN: <br />1. Remove the existing door. Install a six panel, metal <br />insulated door unit. Install lockset and a deadbolt to be <br />keyed the same. Install a peephole and matching interior <br />trim. <br />2. Install an aluminum clad, wood core storm door with <br />a pneumatic closure and vinyl sweep. <br />3. Sand and varnish the existing cabinets with two coats of <br />polyurethane. <br />2 <br />