Browse
Search
Agenda - 02-16-1999 - 8b
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1999
>
Agenda - 02-16-1999
>
Agenda - 02-16-1999 - 8b
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/7/2015 10:14:15 AM
Creation date
7/14/2009 4:44:45 PM
Metadata
Fields
Template:
BOCC
Date
2/16/1999
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8b
Document Relationships
Minutes - 19990216
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' William Council <br />106 Glosson Circle <br />Carrboro, NC 27250 <br />929-4755 <br />1/20/99 <br />EXTERIOR: <br />1. Remove the existing front walkway and steps. Frame <br />and pour a new walkway 3 feet wide and new steps to <br />the driveway. <br />2. Remove the rear porch. Install a 6x 16 deck of pressure <br />treated lumber. Install a ramp of pressure treated lumber. <br />Install pickets on the guard and handrails. <br />3. Install an aluminum clad storm door on the front entrance. <br />Door to have pneumatic closure and vinyl sweep. <br />4. Remove the existing brick and block work at the left, <br />side entrance. Install footer and 2 courses of 8x 16 inch block <br />and 1 course of cap block. Install a 4 inch drain in the floor. <br />Connect the drain to a 4 inch drain line to the outside edge of <br />the driveway. Insta114x4 posts on aluminum brackets and framing <br />for an 8.5x5 foot shed type awning. Install plywood and soffitt to <br />match the existing overhang. Install aluminum drip edge, 151b. <br />felt and three tab shingles, color to match new shingles. Step flash <br />and caulk the shingles to the existing wall. Install 1x6 fascia .Install <br />aluminum, continuous gutter and splashblocks. Install splashblocks <br />under each downspout. Paint all exposed wood (except the pressure <br />treated posts) with two coats of semigloss, latex exterior paint. Pour <br />a 4 inch concrete floor. <br />5. Install splashblocks under each downspout. <br />6. Prepare the front porch slab with a masonry bonding <br />agent. Install a concrete slab with reinforcing wire to the <br />bottom of the front door sill. Slope the slab to provide adequate <br />runoff. Cut the existing 4x4 posts as necessary and install <br />aluminum brackets <br />4 <br />7. Install triple track storm windows on all windows. <br />
The URL can be used to link to this page
Your browser does not support the video tag.