Orange County NC Website
Orange Regional MRF Full System Cost ($) <br />®Collection ■Processing 13 Avoided Tlpfee GTotal Cost <br />$2,500,000.00 <br />$2,000,000.00 <br />$1,500,000.00 <br />,,■■■ <br />Us <br />Raw <br />c <br />::' <br />. <br />U <br />o <br />$1,000,000.00 <br />o <br />WKSM ... <br />MM <br />~ <br />$500,000.00 <br />an <br />: IM <br />.. <br />::E <br />Una <br />.. <br />$- <br />$(500,000.00) <br />Current Costs/ Current Costs/ New MRF/ Current New MRF/ 2002 -03 <br />Current Volumes 2002 -03 Volumes Volumes <br />Volumes <br />Scenario <br />Page 8 - <br />Orange Regional Full System Cost ($ /ton) <br />■ Collectlon ■Processing 13 Avoided Tipfee C: Total Cost <br />$200.00 /ton <br />$150.00 /ton <br />c <br />$100.00 /ton <br />m <br />Q <br />U <br />$50.00 /ton <br />$0.00 /ton <br />- $50.90 /ton <br />Current Costs/ Current Costs/ New MRF/ Current New MRF/ 2002 -03 <br />Current Volumes 2002 -03 Volumes Volumes <br />Volumes <br />Scenario <br />- Page 9- <br />