Browse
Search
Agenda - 02-18-1999 - Attachment 10
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1999
>
Agenda - 02-18-1999
>
Agenda - 02-18-1999 - Attachment 10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2013 11:15:01 AM
Creation date
7/14/2009 3:57:57 PM
Metadata
Fields
Template:
BOCC
Date
2/18/1999
Meeting Type
Work Session
Document Type
Agenda
Agenda Item
Attachment 10
Document Relationships
Minutes - 19990218
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
These figures should not be confused with the "fees" that might be charged by a service provider which <br />will be higher since those need to cover profit and risk. The chart shows a local "merchant MRF tip fee" at <br />$45 /tan leveled across the range of tonnage. It is clear that significant savings are possible in MRF <br />processing through development of a MRF where tip fees would be closer to actual costs especially if the <br />medium or large volume facilities can be built. Again, these are preliminary cost opinions and subject to <br />further refinement. <br />This analysis shows that processing can be secured at affordable costs even with the lower Tier 1 <br />volumes. However, significant benefits are gained when total volume increases with the Tier 2 and Tier 3 <br />facilities . The Tier 2 "medium volume" MRF would provide a very cost effective system for the Orange <br />regional communities, and is expandable at relatively low costs as long as smart choices are made in the <br />beginning with regards to the site selected for the MRF, the building size that is invested in from the start, <br />the accommodations that are made for growth and the continued and growing interest of project <br />participants ready to supply larger quantities of materials to the MRF. <br />2/5/99 Orange Regional MRF LOG Workshop Materials 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.