Browse
Search
Agenda - 02-22-1999 - 1a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1999
>
Agenda - 02-22-1999
>
Agenda - 02-22-1999 - 1a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/7/2015 11:24:54 AM
Creation date
7/13/2009 3:58:32 PM
Metadata
Fields
Template:
BOCC
Date
2/22/1999
Meeting Type
Public Hearing
Document Type
Agenda
Agenda Item
1a
Document Relationships
Minutes - 19990222
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
190
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
inclined to approve it. By like token, they are not seeking to put a paper processing plant on this property because, <br />although the market place might be willing to support that use, the jurisdiction would not. They are asking for a <br />change in residential zoning from R -1 to R -3. This is a change that they believe the market will accept as the <br />highest and best use for the property. The market will buy houses in this location and in the proposed price range <br />on lots of this proposed size at a pace that will justify the cost of the improvements and the development risks <br />required to produced the project. They also believe that their request is absolutely,in keeping with objectives of <br />Orange County. He then read,as follows from the Comprehensive Plan. <br />oAmong the purposes of the Comprehensive Plan is the desire to minimize the existing energy inefficient and land <br />consuming pattern of rural sprawl. The Land Use Element is premised on two basic strategies. - activity nodes and <br />infill development. Unlike the rural areas, these urban areas are presently served, or are scheduled to be served, by <br />municipal water and sewer systems and contain other urban support services which allow for higher density, higher <br />intensity development patterns. The infill development strategy is premised on the desirability of encouraging . <br />development to occur first within the corporate limits of the towns and then, when appropriate, within those areas <br />surrounding the towns which are in transition from rural to urban development patterns. The achievement of a <br />higher rate of infill development than experienced in the past requires a combination of incentives and disincentives <br />to development activity which include, but are not limited to <br />Allowing higher densities and intensity of land uses within urban areas and urbanizing areas <br />Allowing only low intensity uses outside of these areas <br />Streamlining development review processes for high intensity uses <br />Requiring development standards in transition areas similar to those in urban areas, and <br />Phased extension of urban services. <br />The successful achievement of the infill policy would result in more compact and efficient urban form, lead <br />to reduced transportation and energy cost, reduce public services cost, and minimize the conversion of agricultural <br />land to urban uses as a result of development pressures.o <br />He stated that this related to Lawrence Park and the proposal before the Board of County Commissioners in <br />the following ways: <br />This is clearly an,infill location. They are surrounded on all sides by existing residential development. Further, the <br />area of Lawrence Park itself was placed in a 20 -year transition area in the Comprehensive Plan. He pointed out the <br />Lawrence Park area on the map. There are existing residential areas both to the west and to the south in the <br />10 -year transition zone. <br />He then read again from the Comprehensive Plan for a definition of the 20 -year transition zone. <br />oThe 20 year transition area is land located in areas that are in the process of changing from rural to urban, that are <br />suitable for urban type densities and should be. provided with public utilities and services within the second 10 year <br />phase of the plan.o <br />He noted that the Comprehensive Plan was adopted in 1981, which would suggest that Lawrence Park is <br />right on schedule. The Comprehensive Plan further defines the characteristics of these transition zones', relative to <br />eleven criteria, all of which he felt were as strongly, or more strongly met, in 1998 than they were in 1981. <br />These criteria include, <br />°_ Land slope - There are no significant slope or topographical problems that would unreasonably increase the <br />cost of extending water and sewer lines. There is no such problem at Lawrence Park that the development itself is <br />not willing to deal with. <br />° Hydrology - It is located outside of the 100- yearflood prone areas as identified by the Core of Engineers. <br />There is no problem in the development of Lawrence Park in terms of avoiding and having no development contact <br />with these areas, if they in fact exist on the property. <br />°_ Flora and Fauna - Located away from sites, which would, if developed, create a threat to unique and <br />endangered species as identified by the State and Federal government. There are no such species identified at the <br />Lawrence Park area: <br />° Soil Conditions - Located in areas where general soil conditions are suitable for urban uses because of soil <br />drainage characteristics and low bearing capacity for site, development. The Lawrence Park soils are shown as <br />generally slight to moderate for limitation of construction and more severely constrained for septic, which he stated <br />made R -1 zoning without utilities somewhat impractical in this location.. <br />°_ Public services and utilities - Located'in areas which are, or could be, reasonably and efficiently served by <br />centralized public services and utilities. Lawrence Park is close to existing public services. It is less than three miles <br />from where the courthouse is located. Hillsborough water and sewer service will be extended to it. Additionally, the <br />sewer facilities are being designed to accommodate connection by an additional fifty adjacent dwellings that are <br />currently experiencing septic tank failures. <br />°_ Transportation systems - Should be located in areas that have very good road access as well as service by <br />rail lines. These areas should have the most complete transportation network in the County s planning jurisdiction. <br />
The URL can be used to link to this page
Your browser does not support the video tag.