Orange County NC Website
028 B . STATE' PERMITS REQUIR rD <br />1. Does the project involve the mining of earth products? <br />No <br />�a <br />If_so, how many cubic feet of material are expected to be <br />excavated? <br />Has an application for a Mining Permit been submitted to <br />NCDRCD? <br />Please. attach map indicating expected extent of proposed <br />activity. <br />2. Does the project involve 'generation or storage of <br />hazardous or toxic- wastes, as identified b <br />Environmental Protection A enc f Y the <br />hazardous materials is available from listing <br />gP all <br />Department) No of <br />Describe the wastes to be generated. 4 <br />How much material is expected to be generated per month? <br />Will any material be treated.onsite? <br />Volume? <br />Will any material be stored onsite? <br />Volume? <br />Where will-- disposal of the material take place? <br />How will materials be transported to the disposal site? <br />What measures are proposed to protect water quality and <br />air quality ;n case of sp;I <br />