Browse
Search
Agenda - 02-22-1999 - 1a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1999
>
Agenda - 02-22-1999
>
Agenda - 02-22-1999 - 1a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/7/2015 11:24:54 AM
Creation date
7/13/2009 3:58:32 PM
Metadata
Fields
Template:
BOCC
Date
2/22/1999
Meeting Type
Public Hearing
Document Type
Agenda
Agenda Item
1a
Document Relationships
Minutes - 19990222
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
190
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SrA.TE OF N©Rm CAROLINA <br />DF.PARTMENT OF. TRANSPORTATION <br />JAmEs B. HUNT ) R.. <br />COVFR1g0R <br />ORANGE COUNTY <br />Eddie Kink <br />Orange County Planning Department <br />306F Revere Road <br />Hillsborough, NC 27278 <br />DIVISION OF HIGHWAYS <br />18 November 1998 <br />SUBJECT: Preliminary Plan Review: Lawereace Park Subdivision. Located off SR 1709 <br />Dear Mr. Kirk: <br />E. Morris Tolson <br />SECRETARY <br />This office has completed its follow up review of the subject's proposed preliminary plans for compliancc with <br />current Department of '1 n:nusportation minimum subdivistun construction standards. On 3 August 1998, I sent you a <br />letter about the subject Site and the developer sent us a response dated 24 August 1998. In order to save time I will <br />address the previous correspondence in the same order as they appear in both letters. <br />A <br />Lil <br />1 The revised plans with the proposed tutnlanes are accepectable. <br />4. As per the developer's letter 8/24/98, we agree and this item is resolved: <br />6. The 10' x 70' site triangles are still required. NCDOT did agree to reduce the flare (see attachment). <br />7. Permits are still required and needed before constructions. We are.still concerned over the right of way. <br />Orange County needs to set a time for the canstniction of the required the turns lancs in the approval <br />sv everyonc agrees and complies with the requirement. <br />S. Also address in 89. NCDOT did agree to the conditions ofthe developers letter of 24 August 1998 <br />9. Plans have been changed and sign was removed. <br />I- . NC;UU'l' understands and agrees. <br />2. As per the developer's letter, NCDOT agrees and the current plans reflect this agreement. <br />3. The terrain for the site will be Level; however, NCDOT w10 give consideration to rolling <br />classification when warranted. At this time the developer has not submitted all roadway <br />inrurznation and we cannot review this item completely. <br />4. The developer has not addressed their position on standaid curb and gutter or valley ew•b. <br />NCDOT has requested standard 2' -6" cork,, however, the plans do not address-which type they are <br />proposing. In additioni Sheet C -8 needs the typical revised to show stone under the curb. <br />5. We agree with the plans except for the driveway at the two proposed parking lots. <br />The plans show the parking lot drives as a street type entrance and they should be curb cuts. <br />6. NCDOT agreed with the developers proposed striping as shows. on Sheet C -8 ofthe revised plans. <br />7. The developer has agreed and the revised plants reflect this agreement. <br />
The URL can be used to link to this page
Your browser does not support the video tag.