Orange County NC Website
S. OPERATION PERMIT <br />There is no separate application for this permit. It is <br />issued upon approval of the septic system. <br />6. EXISTING SYSTEM INSPECTION <br />You will need an EXISTING SYSTEM INSPECTION if. <br />• you are subdividing property that has an existing <br />house on a parcel. This insures that a repair area for the <br />septic system will remain with the existing house. <br />• you are adding on to an existing house, or making <br />Improvements that require a BUILDING PERMIT. If <br />you plan to add on any room that could function as <br />a bedroom, the septic system may need to be <br />upgraded.* <br />• you are moving a mobile home onto a vacant lot <br />or into a mobile home park. <br />*Before Buiidi-ng Permit issued. <br />8 <br />ENVIRONMENTAL I <br />FEE PLAN <br />I. All fees will be assessed according to the <br />of proper application to the Environmental Health <br />Orange County Health Department <br />2. Any protest or appeal concerning, the pays <br />a final determination made before any service is i <br />3. All fees must be paid in full before the ser <br />4. A refund can be given for any service not <br />where more than one fee has been paid for the s <br />quired additional field trips to a site or property v% <br />appropriate fees. <br />S. No refunds will be given if any portion of t <br />permit issued, inspection made). <br />6. Any wastewater permit or authorization is <br />will be for a specific site, lot or property as define <br />rules along with any conditions stipulated. Any us <br />documents has the responsibility to reimburse thE <br />their Issuance. The Orange County Health Depart <br />responsible for refunds or reimbursements in sud <br />party in such negotiations. <br />7. Denial, suspension or revocation of any pt <br />necessitate the refund of any fee paid for the per <br />8. All refunds will be made in accordance wit <br />procedures. <br />