Orange County NC Website
)EFINMONS <br />initions of some of the terms used in this book <br />r Chapter 130A of the General Statutes of <br />r.ment for occupancy of a residence, place of <br />ably. <br />routine maintenance including replacement of <br />ment to an existing wastewater system. <br />repared by a registered land surveyor, drawn to a <br />than 60 feet, that includes: the specific location <br />urtenances, the site for the proposed wastewater <br />r supplies and surface waters. `Plat' also means, <br />the local planning authority and recorded with <br />)py of the recorded subdivision plat that is <br />Ls drawn to scale. <br />ater System- means a single system of <br />and disposal owned and operated by a sanitary <br />listrict, a water and sewer authority, a county or <br />teration, replacement, or relocation of existing <br />tem. <br />ie, dwelling unit in a multiple family structure, ho- <br />work camp, manufactured home, institution or any <br />2. WASTEWATER SYSTEM CONSTRUCTION AUTHORIZATION <br />If there have already been evaluations of the lot <br />and /or an IMPROVEMENT PERMIT has been issued, <br />your next step is to apply for the WASTEWATER SYSTEM <br />CONSTRUCTION AUTHORIZATION. In addition to filling out the <br />application, you will need to: <br />• submit the plat or site plan of property, <br />showing the proposed driveway and house site <br />• submit a floor plan of the house, and <br />• stake out the house on the lot and clearly <br />Identify the property lines. <br />Both applications must contain the signature of the property owner or the <br />owner's legal representative. <br />3. WELL PERMIT <br />Apply for this permit if you are drilling a new well or replacing an existing <br />well. <br />4. BUILDING PERMIT <br />An application for this permit is provided by the Planning and <br />Inspection Department upon issuance of the IMPROVEMENT <br />PERMIT and the WASTEWATER SYSTEM CONSTRUCTION <br />AUTHORIZATION. <br />7 <br />