Orange County NC Website
• SCENARIO NOTES <br />These scenarios represent three different methods for funding the WTMP expansion. Since the existing <br />WTMP activities are proposed to be folded into a comprehensive approach with the expansion, their <br />numbers are included in these figures. The mechanism for entry into the program is to include all <br />newly installed systems, repaired systems, alternative systems and those gravity flow conventional <br />systems which are re- inspected each year. The gravity flow system re- inspections would begin in the <br />Water Quality Critical Areas in the County, expand into the corresponding watersheds and eventually <br />into other watershed areas not serving as water supplies for Orange County citizens. The projection is <br />that entry of all systems in the County would take 15 -20 years. <br />Because the Board of Health recommended splitting the cost of the program between the system <br />owners and the general fund, each of the three scenarios has been broken down into 60/40 and 80/20 <br />percentage splits. These splits were arbitrarily chosen by staff. <br />The first alternative of an annual operations permit fee originated in the WTMP Expansion workgroup <br />and was the one endorsed by the Board of Health. This fee would be charged to systems owners after <br />their system is installed, repaired or re- inspected. The fee would subsidize the cost of the next re- <br />inspection in five years. If new system owners took advantage of the incentive and voluntarily serviced <br />their system before the fifth year, the fee could be waived for years 5 -10 since no re- inspection would <br />• be necessary before year 11. <br />The second alternative would continue fee collections according to the current setup of billing each <br />existing system owner after their systems are re- inspected. The current WTUT fee is $60 and does not <br />approach full recovery of the service cost. <br />The last alternative is one offered by the County Manager which spreads the pro -rated cost to system <br />owners of the program to all homes/busmesses in the County served by on -site wastewater systems. It <br />has the advantage of minimizing the financial impact of the program to individuals while eventually <br />providing for the re- inspection of all existing systems. <br />Please note that all three paradigms assume 100% collection rates and include only direct personnel and <br />operating costs and- that revenue collection could lag behind the implementation of the program. <br />Furthermore, if extensive failures are discovered, there may be more staff requirements for repair <br />permitting and installation inspection. All system figures are generally based on projected growth rates <br />and estimates from system installations in the 1990's. Finally, the educational and database positions <br />are included in the cost estimates but they are not part of the staff requirements listed on the system <br />estimates spreadsheet. <br />• <br />22 <br />