Orange County NC Website
{ <br />K�/ <br />The area is designated as Agricultural Residential in the adopted Land Use <br />Element of the Comprehensive Plan, and accordingly is zoned AR(U -ENO- <br />PW)-- Agricultural Residential (Upper Eno Protected Watershed). An <br />exception to this zoning is found in the southernmost 2.5 acres of Lot 1 on <br />the south side of the proposed subdivision where the designation is AR(U- <br />ENO-CA) Agricultural Residential (Upper Eno Critical Area). Surrounding <br />land uses are wooded and single family residential. Adjoining parcels are <br />zoned AR <br />The proposed subdivision encompasses 19 acres. It consists of seven two- <br />acre lots and a five -acre lot located partially in the Upper Eno Critical Area. <br />Lot sizes average 2.37a. <br />The subdivision would be accessed from the north side of Carr Store Road <br />via existing Pore Road (private) —a Class A cul de sac to be constructed as <br />an extension of an existing access easement which the developers propose <br />to change the name from Pore Road to Chambers Court. The Class A <br />designation is justified because there are large lots and wider setbacks, and <br />the proposed development is located in a protected watershed. Moreover, <br />covenants will protect permanent open space and prohibit further <br />subdivision. No stubout is recommended for the proposed subdivision <br />because lands to the north are reserved permanently for flood .control <br />purposes, and lands to the west lie within the 100 -year floodplain along the <br />East Fork Eno River. <br />Following the flexible development option as offered in Section IV -B -10 of <br />the Subdivision Regulations, the Concept Plan was approved by the <br />Planning Board on December 3, 1997. The proposal includes 9.35 acres or <br />49% open space which will be privately owned and reserved in the form of <br />conservation easements surrounding identified building areas. The purpose <br />of the easements is to protect woodlands on gentle slopes, streams, and <br />adjacent stream buffers. In addition to these natural buffers along each lot <br />line, easements follow the subdivision boundaries. <br />Planning Staff recommends approval of the Preliminary Plan for the Carl <br />and Teresa Chambers Major Subdivision, with conditions listed in the <br />Resolution of Approval (copy an attachment on pages ) and the <br />recommendation that conservation easements not be included in the 50' <br />front setbacks designated for the development. This suggestion would <br />remove 1.6a of open space making the total 7.75a or 41 %. <br />MOTION: Selkirk moved approval as recommended by the Planning Staff with the <br />conditions listed in the Resolution of Approval and the recommendation <br />regarding conservation easements. Seconded by Andrews. <br />VOTE: Unanimous. <br />(2) Village of the Oaks, Phase V <br />(9 Lots - Bingham Township) <br />Presentation by Jim Hinkley. <br />The applicant proposes a nine -lot major subdivision which is shown as <br />straddling the Orange - Alamance County Line in the northwest quadrant of <br />15 <br />