Orange County NC Website
,~ 5 <br />RESOLUTION <br />OF <br />THE ORANGE COUNTY BOARD OF CONIlVIISSIONERS <br />Date March 3, 1999 <br />Name of Subdivision Village of the Oaks, Section Five <br />Owner/Applicant Rachel T. Best <br />The Board of County Commissioners hereby approves the Preliminary Plan of Section Five of Village of <br />the Oaks, Section, dated August 4, 1998, and subject to fulfillment of requirements specified herein. <br />Acorn Knoll Road shall be public and built to NCDOT standards and shall be maintained by the <br />owner/applicant (Rachel T. Best) and future homeowners of the subdivision, until such time as it is <br />accepted for maintenance by NCDOT or some other governmental body. <br />Before the Final Plat can be recorded: <br />A. Sewage Disposal <br />1. All lots shall contain adequate septic disposal and repair areas, approved by the Orange <br />County Division of Environmental Health. <br />2. Disclosure that the septic system location may restrict the size and location of <br />improvements shall be included in a document describing development restrictions to be <br />recorded concurrently with the Final Plat. The document disclosing that information on <br />the tentative location of septic systems is available from the Division of Environmental <br />Health. <br />B. Roads and Access <br />1. Acorn Knoll Drive shall be constructed to NCDOT public road standards within a 50- <br />foot right-of--way. Construction shall be inspected and approved by the Orange County <br />Erosion Control Division. <br />OR <br />A letter of credit or escrow agreement or other security shall be submitted to secure <br />construction of Acorn Knoll Drive to NCDOT standazds. An estimate of the <br />construction cost must be prepazed by a certified/licensed engineer or grading contractor <br />and submitted to the Orange County Planning Department. The fmancial guazantee must <br />reflect 110 percent of that estimate and be issued by an accredited fmancial institution <br />licensed to do business in North Cazolina. <br />The document describing development restrictions to be recorded with the Final Plat <br />shall state that the financial guarantee will not be released until the road construction has <br />been inspected and approved by Orange County. <br />2. An erosion control plan for construction of Acorn Knoll Drive shall be submitted by the <br />applicant to the Erosion Control Division for review and approval. <br />