Orange County NC Website
.~ <br />EFLAND-CHEEKS COMMUNITY SCHOOL PARK <br />Phase One <br />,3-/~ - 99 <br />ORIGINAL SIGNATURES P~~ <br />55679.CD <br />COPY ~" <br />SECTION 20501 DIST: <br />FORM OF CONSTRUCTION CONTRACT <br />THIS AGREEMENT, made the 15i day of April in the year of 1999 by and between <br />Carl Norris Construction Company hereinafter called the Party of the First Part and the County of Orange; <br />through the Department of Purchasing attn: Pamela K. Jones hereinafter called the Party of the Second <br />Part. <br />WITNESSETH: <br />That the Party of the First Part and the Party of the Second Part for the consideration herein <br />named agree as follows: <br />Scope of Work: The Party of the First Part shall furnish and deliver all of the materials, and <br />perform all of the work in the manner and form as provided by the following enumerated plans, <br />specifications and documents, which are attached hereto and made a part thereof as if fully <br />contained herein: advertisement; Instructions to Bidders; General Conditions; Supplementary <br />General Conditions; specifications; accepted proposal; contract; performance bond; payment <br />bond; power of attorney; workmen's compensation; public liability; property damage and <br />builder's risk insurance certificates, and drawings, titled: <br />Efland Cheeks Community School Park <br />Consisting of the following sheets: <br />L1.0 Site Plan <br />L1.1 Boundary Survey <br />L1.2 Demolition/Clearing Limits <br />L2.0 Layout Plan <br />L2.1 Layout Enlargements <br />L3.0 Erosion Control Plan <br />L3.1 Erosion Control Details <br />L4.0 Grading Plan <br />L5.0 Utility Plan <br />L6.0 Landscape Planting Plan <br />L7.0 Irrigation Plan <br />L7.1 Irrigation Details <br />L8.0 Shelter Plan <br />L9.0 Site Details <br />L9.1 Site Details <br />L9.2 Site Details <br />L9.3 Site Details <br />Dated: February 12,1999 and the following addenda: <br />Addendum No. 1 Dated: February 24,1999 <br />Addendum No. 2 Dated: February 25,1999 <br />2. That the Party of the First Part shall commence work to be performed under this agreement on a <br />date to be specified in a written order of the Party of the Second Part and shall fully complete all <br />work hereunder within 270 consecutive calendar days from said date. For each day in excess <br />thereof, liquidated damages shall be as stated in Supplementary General Conditions. The Party of <br />the First Part, as one of the considerations for the awarding of this contract, shall furnish to the <br />February 12, 1999 20501-1 FORM OF CONSTRUCTION CONTRACT <br />