Browse
Search
Agenda - 03-16-1999 - 9g
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1999
>
Agenda - 03-16-1999
>
Agenda - 03-16-1999 - 9g
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2009 2:51:55 PM
Creation date
7/10/2009 2:51:54 PM
Metadata
Fields
Template:
BOCC
Date
3/16/1999
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
9g
Document Relationships
Minutes - 19990316
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Supplement~he construction fund budget through a combination of 1997 Park Bond <br />funds and County Capital Reserve Fund Balance and direct staff to reduce the <br />project to ft that funding level. <br />Preliminary review indicates that if $100,000 were added to the project it could be <br />built without seriously jeopardizing the functional intent. Should the Board choose to <br />exercise this option, the primary change in scope of the project would be to seed the <br />multi-purpose field rather than sprig it ($55,000 savings). The balance of the money <br />would be made up through a variety of smaller changes. <br />It is notable that the Town of Chapel Hill experienced similar problems with the <br />construction of the Northem Park and it is our understanding was unable to get bidders <br />until the third solicitation. As the Board may recall, the bids for the Northern Park also <br />substantially exceeded funds budgeted by the Town. <br />FINANCIAL IMPACT: This project is funded through 1997 bond funds. The 1999-2008 <br />CIP includes approximately $650,000 for construction of the project. Although it is <br />recommended that the staff be authorized to negotiate some changes in the scope of <br />work, thereby reducing the cost of construction, a minimum of $100,000 additional <br />appropriation will be necessary to build the park which reasonably meets the functional <br />intent of the master park plan for the area. <br />RECOMMENDATION(S): The Manager recommends that the Board exercise option #2 <br />above, in which an additional $100,000 is appropriated as follows: $50,000 from 1997 <br />Park Bond proceeds, and $50,000 from the County Capital Fund Balance; alternate #1 <br />(sprigging) and #3 (metal bollards) are specifically not taken; and staff is authorized to <br />negotiate with the contractor to bring the construction contract into line with the available <br />funding; and that the construction contracts be approved, contingent upon the final <br />contract amount not exceeding $756,000; and authorize the Chair to sign on behalf of <br />the Board. <br />
The URL can be used to link to this page
Your browser does not support the video tag.