72e3 - 3i -q5' <br />ORANGE COUNTY SCHOOLS <br />Facilities Development Program <br />PLANNING PHASE <br />1. Programming <br />• Establish System -wide Program Committee <br />• Determine Program Requirements <br />• Develop Scope of Project <br />• Prepare Program Budget <br />• Develop Milestone Schedule <br />2. Facility Guidelines <br />• • Establish Technical Advisory Committee <br />• Prepare Building Systems Criteria <br />• Document Maintenance and Operations Criteria <br />• Analyze DPI Facility Standards — Project Specific <br />3. Site Analysis <br />• Establish Site Selection Criteria <br />• Select Site /Alternatives <br />• Conduct Geotechnical Study <br />• Evaluate Environmental Issues <br />• Evaluate Public Utility Services <br />• Recommend Site and Negotiation of Price <br />• Prepare Boundary Survey and Topographical Survey <br />4. Designer Selection <br />• Advertise Request for Qualifications (RFQ) <br />• Evaluate Proposals and Conduct Interviews <br />• Selection Committee Recommends Design Firm/Consultants <br />• Negotiate Design Fees and Prepare Contract <br />• Award of Contract <br />DESIGN PHASE <br />1. Schematic Design <br />• Document Committee /Community Input <br />• Establish Critical Project Parameters <br />• Prepare Conceptual Plan <br />• Prepare Conceptual Cost Estimate <br />• Review and Approval of Schematic Design <br />2. Design Development <br />• Finalize Building Configuration and Size <br />• Determine Building Systems and Materials <br />• Conduct Constructibility Reviews <br />• Prepare Detailed Estimate <br />• Initiate Discussions with Regulatory/Review Agencies <br />• Review Outline Specifications <br />