Orange County NC Website
VALUE ENGINEERING PROJECT STUDIES <br />TASK FLOW DIAGRAM <br />PRESTUDY PHASE <br />pro9ect <br />coordiination <br />. Verity Schedule <br />prestudy <br />preparation <br />• Collect Design Data <br />construction cost <br />(CC) model <br />• Distribute by Process <br />annual cost <br />(ACC) model <br />• Include Energy <br />life c cle cost <br />(LCCy) model <br />• Include CC <br />' Outline Format <br />for Cost Data <br />• Distribute to Team <br />• Distribute by Trade <br />• Include Labor <br />a Include AC <br />• Format for <br />Members <br />Construct Graphic Model <br />: Include aS�pplies/ <br />. Distribute Cosh <br />Degsrnde Presentation <br />• Cost Data <br />• Define High CC Areas <br />• Distribute Costs <br />•Compare to Previous <br />Cost Models <br />' Orientation <br />Meeting <br />• =9 RojecT <br />Constraints <br />• Compare to CC Model <br />• Define High LCC Areas <br />orientation <br />• Introduction by Program <br />Coordinator <br />• Project Description and <br />Presentation by Designer <br />• Site Visit or Familiarization <br />• Define Owner Require- <br />ments <br />PROJECT STUDY PHASE <br />information phase <br />• Analyze Project Costs <br />creative phase <br />• Introduction to Creative <br />• Function Analysis <br />Thinking. <br />• Fast Diagram <br />•Creative Idea listing <br />• Identify H�ah Cost Areas, <br />f • Quantity of Idea <br />LCC and CC <br />2• Association or ideas <br />• Identify High Energy Areas <br />3' �n �I e <br />• Develop Cost/Worth Rallos <br />4. Man Hkkg Effect <br />• <br />Check Comotitertzed kiwi Brainstorming <br />Bank From Previous Studies <br />judgement phase <br />• Eliminate Impractical <br />Ideas <br />• Maintain Quality <br />• Improve Efficiency <br />• List Advantages and <br />Disadvantages <br />• Select Ideas for <br />Development <br />IMPLEMENTATION PHASE <br />(POST STUDY PROCEDURES) <br />ve study report <br />final acceptance <br />• prepare VE Preliminary • Submittal of Redesign <br />Report Estimate to Owner <br />• Conduct Post Workshop • SubmlHal of VE Reports <br />Meeting with Owner and to RegWatory Agencies <br />Designer • Approval and Incorpora- <br />• Designer Prepares Final Lion Into Final Design <br />Report <br />I development I <br />phase <br />• Develop Preliminary <br />Design of Ideas <br />• Prepare ABemate <br />Design Sketches <br />• Prepare Estimate <br />.' CCo �rree on Ufe Cycle <br />Use Computerized Cost <br />Estimating and Design <br />Criterla Databases <br />presentation <br />phase <br />• Summarize Findings <br />• Present VE Ideas to <br />Owner - Designer <br />•Determine Acceptance <br />of Ideas <br />Iff PACIFIC ENVIRONMENTAL SERVICES, INC. <br />