Browse
Search
Agenda - 03-31-1999 - 1c-1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1999
>
Agenda - 03-31-1999
>
Agenda - 03-31-1999 - 1c-1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2013 4:49:34 PM
Creation date
7/8/2009 4:21:27 PM
Metadata
Fields
Template:
BOCC
Date
3/31/1999
Meeting Type
Schools
Document Type
Agenda
Agenda Item
1C-1
Document Relationships
Minutes - 19990331
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WORKSHOP AGENDA <br />Introduction <br />Project Orientation <br />Project Description and Presentation by the Designer <br />Information Phase y <br />Familiarization by team members with the contract plans and specifications. <br />Continue familiarization with project and begin the Functional Analysis of the project. <br />Prepare a graphical presentation of the Cost Model, which is prepared prior to the study. <br />Look at the total system first and then at the component parts. Review energy utilization <br />of the system design using the Energy Model prepared in the prestudy phase. <br />Creative Phase <br />Begin creative idea listing. The aim is to obtain quantity and association of ideas, <br />to eliminate roadblocks and to allow free flow of ideas. <br />Judgement Phase <br />The value engineering team analyzes the ideas listed in the creative session and <br />selects the best ideas for further development. <br />Development Phase <br />Value engineering team members prepare alternate designs for consideration with <br />life cycle cost comparisons of the original designs and proposed alternatives. All <br />recommendations will be backed up with sketches, basic concept and recommendation <br />of alternatives. <br />Presentation Phase <br />Pacific Environmental Services, Inc. will provide all VE worksheets to be used <br />during the study. The results of the team efforts will be summarized in an oral <br />
The URL can be used to link to this page
Your browser does not support the video tag.