Browse
Search
Agenda 04-20-1999 - 10a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1999
>
Agenda - 04-20-1999
>
Agenda 04-20-1999 - 10a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2013 8:52:43 AM
Creation date
6/24/2009 9:50:37 AM
Metadata
Fields
Template:
BOCC
Date
4/20/1999
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
10a
Document Relationships
Minutes - 19990420
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Frequently Asked Questions <br />1.) Is our city required to construct <br />towers or pay any other development <br />expenses? <br />No. Construction and development costs <br />are typically paid by the wireless carrier. <br />However, some municipalities have elected <br />to construct their own towers. <br />2.) Are new towers required for all <br />antenna sites? <br />No. Antennas have been placed on all <br />types of existing properties. Water tanks <br />work particularly well. Existing city <br />communication towers and the roof tops <br />of buildings can be used for antenna sites. <br />Parks, waste treatment facilities, schools, <br />and hospitals can also be used. <br />3.) How high must the antennas be <br />mounted? <br />Typical heights are generally 125' - 150'. <br />However, higher elevations may be <br />necessary. On the other hand, antennas have <br />sometimes been mounted on rooftops or <br />existing structures at lower elevations. <br />4.) How long will it take to install a <br />PCS system in our area? <br />Each PCS licensee has a different timetable <br />for the development of its system in your <br />area. We expect your market will be <br />substantially developed during the next five <br />(5) years. <br />5.) Do most PCS /Cellular carriers <br />have the condemnation powers of other <br />utilities? <br />No, unless regulated as a public utility. <br />6.) Can more than one wireless <br />company place their antennas at the <br />same location: <br />Yes, provided the engineering is appropriate. <br />7.) What are typical lease rates for <br />these antenna sites? <br />Lease rates are not standardized. Each lease <br />is typically priced according to the type of <br />site and other market factors. <br />S.) What antenna site maintenance <br />costs will the city need to pay? <br />None. <br />9.) What is the typical lease term for <br />antenna sites? <br />Generally 20 - 25 years in 5 year segments. <br />10.) When does our city receive the <br />income from antenna site leases? <br />Upon inception of the lease. Each antenna <br />site lease will most likely have a different <br />inception date. <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.