Orange County NC Website
28 ' <br />~; <br />. developers will be responsible for satisfying the <br />• "no damage" standard (except as covered by (3) <br />above) and may be required to design and <br />construct additional facilities to bring the <br />development into compliance. <br />It has bees noted that if the Board wishes to accept <br />the change to the stormwater design standard, <br />companion changes will be needed for Section 15- <br />262 and A dix I of the Land Use Ordinance. <br />20 15-269(b) and (c) Establishes Northern Transition ' Area stream <br />buffer requiremeab in the text of the ordinance, <br />• rather than through the won of as overlay <br />zone. <br />24 15-27 Specifies that NTAAC submits regular reports to <br />Orange County BOCC, that BOCC appoints 3/5 <br />members, and that members are limited to.no more <br />than two consecutivethree-year terms. <br />-, <br />-~ <br />~~~ ~s.•is~~~~~ea~._~r••e.~nr..,~3~nie+esr•,~re~~~r~rae..~wiwe~.:3!!R"L"L~'&.'!!~!~-1N63J~'~!1: ~+Tlt!':~.~Tt•T!S~r~+r+.~~!!R~r!+e~a<~sx <br />