Browse
Search
Agenda 04-20-1999 - 8b
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1999
>
Agenda - 04-20-1999
>
Agenda 04-20-1999 - 8b
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2009 9:36:22 AM
Creation date
6/23/2009 3:47:52 PM
Metadata
Fields
Template:
BOCC
Date
4/20/1999
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8b
Document Relationships
1999 NS Housing Rehabilatation Contract Award
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\1990's\1999
Minutes - 19990420
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 ' <br />12. Clean the windows and storm windows. <br />FRONT BEDROOM: <br />1. Remove the charred furring strips and replace with <br />likesize lumber <br />2. Remove the paneling, carpet, baseboard and entrance <br />and closet door <br />3, Cover all surfaces with Kilz. <br />4. Install ~a inch styrofoam insulation on the exterior <br />walls. <br />5. Ynstall one vinyl rcpalcement window and trim. <br />6. Install th inch sheetrock on the walls and ceiling. <br />Tape and fizush the sheetrock smooth. <br />7. Remove the existing front window and frame in <br />the opening. <br />8. Install colonial style baseboard and casing. <br />9. Install a six panel entrance and closet door .Install <br />a privacy lockset and a closet lockset. <br />10. Install 1x12 shelf, closet rod and bracket in the <br />closet. <br />11. Paint the ceiling with ceiling white latex paint. <br />paint the walls with flat latex paint and the trim with semigloss <br />latex paint. Paint to cover completely. <br />12. Install carpet and-pad. Carpet allowance to be $l.4%yd: ' <br />REAR BEDROOM: <br />1. Remove the wall and ceiling covering to the furring strips. <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.