Browse
Search
S Agreement - Planning - Resolution Endorsing Congestion Mitigation and Air Quality (CMAQ) Grant Agreement with the NCDOT 05-19-2009-4q
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
BOCC Grants
>
2000 - 2009
>
2009
>
2009 Grants
>
S Agreement - Planning - Resolution Endorsing Congestion Mitigation and Air Quality (CMAQ) Grant Agreement with the NCDOT 05-19-2009-4q
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2017 3:29:29 PM
Creation date
6/19/2009 11:31:07 AM
Metadata
Fields
Template:
BOCC
Date
5/19/2009
Meeting Type
Regular Meeting
Document Type
Agreement
Agenda Item
4q
Document Relationships
Agenda - 05-19-2009 - 4q
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2009\Agenda - 05-19-2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SIGNAGE <br /> The County shall provide and maintain adequate signage and other warning devices for the <br /> protection of the public in accordance with the approved traffic control plans for the Project and <br /> the current edition of the Manual on Uniform Traffic Control Devices(MUTCD)for Streets and <br /> Highways,or any subsequent revision of the same, published by the Federal Highway <br /> Administration and effective at the time of award of the contract. <br /> SITE LAYOUT <br /> The County shall be responsible for ensuring that all site layout,construction work, and Project <br /> documentation are in compliance with applicable city, state and federal permits, guidelines,and <br /> regulations, including American Association of State Highway and Transportation Officials <br /> (AASHTO)guidelines and American with Disabilities Act(ADA)Standards for Accessible Design <br /> (www.usdoo.gov/crt/ada/stdspdf.htm). <br /> CONSTRUCTION ENGINEEERING,SAMPLING,TESTING <br /> The County, and/or its agent, shall perform the construction engineering, sampling and testing <br /> required during construction of the Project, in accordance with Departmental procedures, <br /> including the Department's Guide for Process Control and Acceptance Sampling and Testing. <br /> The County shall document that said compliance was accomplished in accordance with State and <br /> Federal procedures, guidelines, standards and specifications. <br /> RIGHT TO INSPECT <br /> The Department and representatives of the Federal Highway Administration shall have the right to <br /> inspect, sample or test, and approve or reject, any portion of the work being performed by the <br /> County or the County's contractor to ensure compliance with the provisions of this Agreement. <br /> Prior to any payment by the Department, any deficiencies inconsistent with approved plans and <br /> specifications found during an inspection must be corrected <br /> CONTRACTOR COMPLIANCE <br /> The County will be responsible for ensuring that the contractor complies with all of the terms of <br /> the contract and any instructions issued by the Department or FHWA as a result of any review or <br /> inspection made by said representatives. <br /> Agreement ID# 149 13 <br /> I <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.