Orange County NC Website
Clcrober 17, ?006 <br /> ,tits. Pamela K. Jones, Director <br />GLENN D. CORLEY, AIA Department of Purchasing and Central Selz=ices <br />Presicien[,C£O Cauntt= Ot Ora177e <br />KENNETH E. REDFOOT, AIA PO Box 5141 <br />Lice president Hillsborough, N C 2727F; <br />\4ARK 2ACK, AlA <br />VicePresidenr RF.: Proposed Central Orange Senior Center at Sportsplex <br />MICHAEL L. HAMMERSI.EY, PE Hillsborough, NC <br />Principal CRZ #0515 <br />LAIIRF.NCE W. BUNCH, AIA REVISED PROPOSAL FOR PROFESSIONAL DESIGN SERVICES <br />.Associate <br />ANDR[W R. CRI;ICKSHANK, AIA Dear 1U1G. Jones: <br />Associate <br />CHARLENE E. HANLEY, AIA As you know, the scope of work for the above-referenced project has uureased <br />Associate since our original fee proposal teas presented to you. <br />DAV1D M. TAYLOR, AlA <br />Associate The project note includes not only renovations to the existing building and an <br />HARRY M. JENSEN addition that twill house the Central Orange Senior Center, Lout also <br />associate ~ accommodations for the Adult Day Health Center (ADHC) in a renovated area <br />KENNETH E. SMITH directly adjacent to the Senior Center. Two other components of the scope of <br />Associate work are related to the Sportsplex operations: building a mezzanine with a <br /> locker roam below in the ice rink area, and renovating existing areas associated <br />• with the Commons to better serve the fwutional and operational needs of the <br /> Sportsplex. <br /> CRTs origuZal fee proposal dated 5/1/05 pra~~ided Basic Services fora 15,000- <br /> SF Senior Center, which consisted of a 10,000-SF addition and 5,000 square feet <br /> of renovated space. Our proposal was based on a floor plan dated 3/15/0,5 <br />Po Box 23ss with the understanding t)zat our design work would be completed in a time- <br />Chapel Hill, NC 27575-2368 frame that led to a grand openuig ui mid-December, 2006. <br />222 Cloister Court <br />Chapel Fiill, >vc 2;5~~-22t2~ The four components of tvark proposed at tltis time increase the original square <br /> faotago from 1,000 to approximately 35,000, including both nets additions <br /> (mezzanine in ice hockey rusk and renovations), and cost estimates are <br /> undert~-av far the increased sco}?e of t~-ark based on our latest draavings. <br /> <br /> 6ascd ,gin the re~~ised scope of t•~-,-irk, and on our understalldin~ of the bodged <br />• YEAR 5 and. schedule, ~~~e propose a ~~rofessi~~na1 design services fee of 5407,20(1; <br /> <br />~ 11i14h'CVer, fees paid under the original letter of agreement (dated 5/l ; 05) for the <br />• ~ t Schematic I~etiign plus a p<,rtion of the foss paid f~,r the PI'Ogl'i311lnling and <br /> 1'reluniilrv Design letter dated August 22, 2i)Oh, are <:,(fered as a credit to the <br /> <br />(919) 407.-$5gh "1'eleghune overall fee. This credit LIRIOLU"1tS to 525,9.10; thcr~frn-e, ~~-e hropc?se a fee of <br />• <br /> <br />(919) 443-i3Qti Fax 5375,260 for Basic SeIvices on the Pro <br />ect. <br />1 <br />wwcv.corlepred footzack.com <br />