Browse
Search
RES-2009-052 Resolution Endorsing Comprehensive Transportation Planning Study for Orange Co
OrangeCountyNC
>
Board of County Commissioners
>
Resolutions
>
2000-2009
>
2009
>
RES-2009-052 Resolution Endorsing Comprehensive Transportation Planning Study for Orange Co
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2011 9:30:20 AM
Creation date
6/18/2009 10:31:25 AM
Metadata
Fields
Template:
BOCC
Date
6/16/2009
Meeting Type
Regular Meeting
Document Type
Resolution
Agenda Item
4z
Document Relationships
Agenda - 06-16-2009 - 4z
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2009\Agenda - 06-16-2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
/Z, <br />~~ ~~l~ln <br />ORANGE COUNTY BOARD OF COUNTY COMMISSIONERS <br />A RESOLUTION ENDORSING A COMPREHENSIVE TRANSPORTATION PLANNING <br />STUDY FOR ORANGE COUNTY <br />WHEREAS, Orange County realizes the significance of a county-wide comprehensive <br />multi-modal transportation plan in replacing all previous highway thoroughfare plans and <br />in providing guidance for all future modal travel need, recommendations and decisions; <br />and <br />WHEREAS, Orange County, as a member of the Triangle Rural Planning Organization <br />(TARPO, has previously informed the North Carolina Department of Transportation <br />(NCDOT) of its desire for a comprehensive multi-modal planning study to be performed; <br />and <br />WHEREAS, Orange County is also a member of the Durham-Chapel Hill-Carrboro <br />(DCHC) Metropolitan Planning Organization (MPO); and <br />WHEREAS, DCHC MPO recently completed transportation studies to develop a <br />Comprehensive Transportation Plan while developing its current 2035 Long-Range <br />Transportation Plan; and <br />WHEREAS, Orange County recently adopted a 2030 Comprehensive Plan that includes <br />a Transportation Element with goals and objectives, one of which is to "Create and <br />implement an Orange County Comprehensive Transportation Plan that provides the <br />framework for a comprehensive and connected transportation system supporting a mix <br />of all transportation modes, including sidewalks and bicycle facilities, bus and rail transit <br />facilities, and highways. The plan should be coordinated with the goals and objectives of <br />this Comprehensive Plan and seek to maintain and enhance community character and <br />the natural environment."; and <br />WHEREAS, the Orange Unified Transportation Board (OUTBoard) and the Planning <br />Board served as the Lead Advisory Boards for developing the Transportation Element <br />of the Comprehensive Plan; and <br />WHEREAS, there is a critical need to analyze the specific needs of the strategic <br />highway corridors in Orange County as designated in the North Carolina Strategic <br />Highway Vision Plan and to recognize these strategic highway corridors in a <br />Comprehensive Transportation Plan; and <br />WHEREAS, the NCDOT Transportation Planning Branch, with assistance from the <br />Triangle Area Rural Planning Organization, is charged with cooperatively developing a <br />multi-modal Comprehensive Transportation Plan for the area in Orange County outside <br />Metropolitan Area Boundaries including all stakeholders, as well as the interests of the <br />general public; and <br />
The URL can be used to link to this page
Your browser does not support the video tag.