Browse
Search
Agenda - 06-16-2009 - 4kk
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2009
>
Agenda - 06-16-2009
>
Agenda - 06-16-2009 - 4kk
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2009 10:18:01 AM
Creation date
6/16/2009 12:33:51 PM
Metadata
Fields
Template:
BOCC
Date
6/16/2009
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
4kk
Document Relationships
Minutes - 20090616
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2009
S-Grant Agreement - Planning kk. Resolution Endorsing American Recovery and Reinvestment Act (ARRA) Grant Agreements with the North Carolina Department of Transportation 06-16-2009-4kk
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\BOCC Grants\2000 - 2009\2009\2009 Grants
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 <br />2. SCOPE OF PROJECT <br />The Project consists of constructing an approximately 0.62-mile 10-foot wide paved multi-use trail <br />which connects Morris Grove Elementary School on Eubanks Road to the end of the County's <br />property following the sewer easement along Jones Creek through Twin Creeks Park off the east <br />side of Old NC 86. <br />The Department's funding participation in the Project shall be restricted to the following eligible <br />items: <br />^ Construction <br />as further set forth in this Agreement. <br />3. FUNDING <br />Subject to compliance by the County with the provisions set forth in this Agreement and the <br />availability of federal funds, the Department shall participate up to a maximum amount of Four <br />Hundred Twenty Nine Thousand Four Hundred Fifty Seven Dollars ($429,457), as detailed <br />below. The County shall provide a local match, as detailed in the FUNDING TABLE below, and all <br />costs that exceed the total estimated cost. <br />FUNDING TABLE <br />Fund Source Federal Funds <br />Amount Reimbursement <br />Rate Non-Federal <br />Match $ Non-Federal <br />Match Rate <br />ARRA $429,457 100 % $0 0 <br />Total Estimated Cost $429,457 <br />4. USEFUL LIFE <br />The Useful Life of this Project is determined to be 20 years. Any leases or encroachments <br />entered into by the County for this Project shall be for the length of the Useful Life. If the Project <br />ceases to be used and designated as described in this Agreement, within the period of the Useful <br />Life, the Department will require reimbursement for the amortized value of the Department's initial <br />investment. <br />Agreement ID # 446 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.