Browse
Search
NS Housing Rehabilitation Contract Award
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2007
>
NS Housing Rehabilitation Contract Award
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2011 9:51:57 AM
Creation date
6/16/2009 11:15:02 AM
Metadata
Fields
Template:
BOCC
Date
3/27/2007
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
5h
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~s <br />~oxarmvM <br />TO: Housing Rehabilitation Contractors <br />FROM: Orange County Housing and Community Development <br />DATE: November 13, 2006 ~ . <br />RE: 109 Roberts Street, Carrboro -Edna Taylor <br />Work Writeup -Addendum 2 <br />Listed below' are changes to the General Construction work wrietup and bid <br />package dated .10/26/06 for the referenced project. All -other conditions and <br />descriptions remain the same. Please be reminded that bids will be opened and <br />read aloud on November 16, 2006 at 3:OOP.M. in the Housing and Corrmiunity <br />Development Department office at 300 'W. Tryon Street, Hillsborough, N.C. <br />27278. The changes are ss follows: <br />D. PLUMBING <br />2. Delete description and add as follows: <br />. Supply and install new concrete pad at rear exterior of house to <br />accommodate installation of new pre-fah metal water heater shed. <br />Supply and install new pre-fah metal water heater shed on new <br />concrete pad. Properly disconnect services to existing gas water <br />hea#er. Reconfigure existing gas and water lines to accommodate <br />relocation of water heater location to new water heater shed. <br />Relocate existing water heater to new shed. Supply and install new <br />gas and plumbing connections to water heater and restore to proper <br />working order. Includes proper venting aad new P/T overflow drain <br />line compah'ble with existing P/T valve, complete. Includes <br />accommodation for new expansion tank as provided in PLUMBING, <br />Item 3. Repair Kitchen floor where water hearer was remove to <br />restore to proper working~:order,vachiding use Owner-supplied floor <br />_ cover material to repair floor cover. All work to code. <br />3. Change description as follows: <br />Expansion tank to be located in crawlspace adjacent to new water <br />heater location. <br />Ii:1Hou:iagKebabuou ~vclionrAddend~rm1.2-9-06.doo <br />
The URL can be used to link to this page
Your browser does not support the video tag.