Browse
Search
NS Housing Rehabilitation Contract Award
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2007
>
NS Housing Rehabilitation Contract Award
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2011 9:51:57 AM
Creation date
6/16/2009 11:15:02 AM
Metadata
Fields
Template:
BOCC
Date
3/27/2007
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
5h
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MEMORANDUM <br />TO: - ~ Housing Rehabilitation Contractors ~~ <br />FROM: Orange County Housing and Community pevelopment <br />DATE: ~ October 26, 2006. ~ ~ - <br />RE: l09 Roberts Street, Carrboro -Edna Taylor <br />Work Writeup - Addendum 1 <br />Listed below are changes to the General. Construction work wrietup and bid <br />package dated 10/26/06 for. the referenced project All other conditions and <br />descriptions. xemain the same, ~ Piease be reminded that bids will be opened and <br />read aloud on November 2, 2.006 at 3:0(?P.M. in the Housing and Community <br />Development Department offcq ax 300 W. Tryon S'tceet, ~ Hillsborough, N.C. <br />27278. 'Fhe changes are as follows: - - <br />E. ELECTRICAL _ . <br />- Change: 9. Delete entire description. <br />Replace with' "Remove six (6) existing ceding . <br />light fixhaxes throughout house and one existing wall <br />light fixture in Bathroom. Inchiiles tcwo' {2} existing <br />ceiling fans to be removed for re-installation. Adjust <br />electrical bones and .wiring for six (6) ceiling light <br />fQCtures to accommodate installation of new sheetrock <br />overlay on ~ ceilings throughout horse. Adjust <br />electrical box and wnring for Bathroom wall .light <br />fixture to accommodate installation of new wall light <br />fixture. Supply and install three (3) new incandescent. <br />ceiling light ftxtuxes throughout house and new <br />inc~nde'scent wall light fixture in Bathroom. -Supply <br />and install new fluorescent ceiling light facture in <br />Kr~chen. Re-install _ .two. (2} existing ceiling fans at <br />same locations and restore to proper working order. <br />All work complete and to code. . <br />- $ <br />G. ~ INSULATION & WEATHERiZATION <br />Change: 2. ~ Includes clearing insulation and nesting debris <br />from soffit vents to provide clear ventilation. <br />5~- <br />• <br />xlHaais~Rehab~couacylTaylor,Bane ~ Mddcndmat iai6-obao~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.