Browse
Search
NS Housing Rehabilitation Contract Award
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2007
>
NS Housing Rehabilitation Contract Award
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2011 9:51:57 AM
Creation date
6/16/2009 11:15:02 AM
Metadata
Fields
Template:
BOCC
Date
3/27/2007
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
5h
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Name: Edna Taylor <br />Address: 109 Roberts Street <br />City: Carrboro <br />Phone #: 929-1767 <br />Date: 10/25/06 . <br />Page 10 of 11 <br />$~ <br />install new white vinyl base material on tub/floor cover joint with appropriate <br />adhesive, complete. Includes caulking all seams at baseboard. Includes new <br />metal transition strip on Bathroom/Hall transition. New materials to match <br />existing as close as practical. <br />2. Remove existing shower surround material and underlying sheetrock to <br />bare framing. NOTE: After removal work is complete, if further damage <br />is discovered the Owner, Contractor and Rehabilitation Specialist will <br />meet to review the. work, determine a course of action and, if necessary, a <br />cost for any additional work. Supply and install new moisture resistant <br />sheetrock on existing wall framing in shower surround area, including <br />sealing, taping and smooth finish surface. New sheetrock to have smooth <br />transitions to existing adjacent ceiling and wall sheetrock. All new <br />materials, finish surfaces and finishes to match existing as close as <br />practical. <br />3. Replace plumbing to accommodate installation of new single-handle <br />tub/shower faucet control. Supply and install new sectional fiberglass <br />shower surround properly sealed to prevent moisture penetration, <br />complete. Supply and install new finish plumbing fixtures, complete. <br /> <br />4. Fully prepare painted surfaces in Bathroom, including walls, ceiling and <br />trim, ready to receive new paint. Includes patch and repair of sheetrock <br />holes and surface cracks and prime all new or "raw" materials. Paint <br />walls, ceilings, trim, baseboard and shoe mold with interior latex enamel <br />semi-gloss finish paint and restore to proper working order. Color per <br />owner selection. New materials to match existing as close as practical. <br />• <br />TOTAL PRICE ~ <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.