Browse
Search
NS Housing Rehabilitation Contract Award
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2007
>
NS Housing Rehabilitation Contract Award
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2011 9:51:57 AM
Creation date
6/16/2009 11:15:02 AM
Metadata
Fields
Template:
BOCC
Date
3/27/2007
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
5h
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Name: Edna Taylor <br />Address: 109 Roberts Street <br />City: Carrboro _ <br />Phone #: 929-1767 <br />Date: 10/25106 <br />Page 6 of 11 <br />3. Supply and install new electrical to accommodate installation of new GFI <br />outlets in Bathroom, Kitchen and Laundry area. Supply and install new <br />GFI outlets, complete, as follows: One replacement in Bathroom, one <br />replacement and one new in Kitchen and one new in Laundry area. <br />4. Supply and install new electrical to accommodate installation of new <br />"direct-wired" smoke detectors in Hall and each Bedroom. Supply and <br />install new "direct-wire" smoke detectors, complete, as follows: One in <br />Hall, and one in each of three Bedrooms. <br />5. Supply and install new electrical to accommodate installation of two new <br />outlets in the Den and in each of three Bedrooms, one outlet on each wall <br />that does not have an outlet. Supply and install approximately eight new <br />outlets in Den and Bedrooms, complete. <br />6. Supply and install arc fault interrupter circuits on Bedroom circuits. $ <br />7. Supply and install new electrical to accommodate installation of new <br />range hood on existing wall cabinet over stove in Kitchen. Supply and <br />install new ducted range hood, including ducting through existing wall <br />cabinet and to exterior of house properly sealed and waterproofed, <br />complete. <br />8. Supply and install new electrical to accommodate installation of new <br />moisture-rated exhaust fan in Bathroom, ducted to exterior of house, with <br />separate switch control located adjacent to existing Bathroom light switch. <br />Supply and install new moisture-rated exhaust fan, including ducting to <br />exterior of house properly sealed and waterproofed, complete. <br />9. Adjust electrical boxes and wiring on 6 ceiling light fixtures to <br />accommodate installation of new sheetrock overlay on ceilings throughout <br />house. Includes remove and re-install existing fixtures and restore to <br />proper working order, complete. <br /> <br /> <br />• <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.