Browse
Search
NS Housing Rehabilitation Contract Award
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2007
>
NS Housing Rehabilitation Contract Award
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2011 9:51:57 AM
Creation date
6/16/2009 11:15:02 AM
Metadata
Fields
Template:
BOCC
Date
3/27/2007
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
5h
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />Name: Edna Taylor <br />Address: 109 Roberts Street <br />City: Carrboro <br />Phone #: 929-1767 • <br />Date: 1 Q/25/06 <br />Page 5 of 11 <br />accommodate installation of new plastic drain line for washing machine. <br />Includes all necessary connections, fittings, complete. Atl work to code. <br /> <br />5. Properly disconnect existing plumbing supply and drain lines extending <br />from washing machine to below subfloor. Remove existing drain line <br />extending through crawlspace to rear exterior of house. Repair and seal <br />remaining holes in floor where plumbing was removed. Repair existing <br />wall directly behind washing machine to accommodate installation of new <br />washing machine box. Supply and install new washing machine box in <br />existing wall directly behind washing machine. Supply and install new <br />plumbing supply and drain lines within existing wall to service washing <br />machine box, including proper connection to existing water lines and new <br />• drain line below subfloor . Includes all necessary connections, fittings, <br />complete. All work to code. <br /> <br />E. ELECTRICAL <br />1. Properly disconnect and abandon existing electrical service. Supply and <br />install new 200 AMP electrical sevcice to house including new breaker <br />panel, mast, weatherhead, and grounding, complete. Work shall be <br />performed in an efficient, workmanlike manner so as to keep "down time" <br />and temporary connections to a minimum. Includes remove existing <br />breaker panel and repair existing wall to accommodate installation of new <br />breaker panel. Supply and install new breaker panel at same location. <br />Includes new circuits, breakers and proper grounding, complete. Circuits <br />and breakers to be clearly identified. Includes proper grounding for <br />existing and new outlets. Newly installed junction boxes in attic and <br />underfloor shall be located so they are not covered by insulation. All work <br />to code. <br />2. Separate and add circuits to alleviate overloaded circuits on electrical <br />system. HVAC, washing machine and microwave to be each on separate <br />circuits. <br />~-7 <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.