Browse
Search
NS Housing Rehabilitation Contract Award
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2007
>
NS Housing Rehabilitation Contract Award
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2011 9:51:57 AM
Creation date
6/16/2009 11:15:02 AM
Metadata
Fields
Template:
BOCC
Date
3/27/2007
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
5h
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
35 <br />• MEMORANDUM <br />TO: Tara Fikes, Director of Housing and Community Development <br />FROM: ~ Jim Hutcherson, Housing Rehabilitation Specialist <br />DATE: February 26, 2007 <br />RE: 904 Glosson Circle, Carrboro <br />Rehab Bid Process <br />This memo is written to provide information and clarification regarding the chosen <br />course of action for the bid process of the rehab portion of the project on the <br />subject property. <br />The rehab portion of this project was initially bid through our typical bid process. <br />Bid packages were prepared, the bidwalk was scheduled, contractors were <br />invited, and the bidwalk was conducted. At the first scheduled bid opening only <br />two bids had been submitted. As such, the bids were not opened and a second <br />. bid opening was scheduled and announced. <br />At the second opening two bids had been submitted and were opened. In <br />reviewing the two bids it was determined that both of them exceeded our in- <br />house estimate. After careful consideration of the scope of work, the estimated <br />cost and the bid costs it was decided to scale back the scope of the work and <br />attempt to negotiate with the lowest bidder, Diamond Builders. Diamond Builders <br />was approached, was responsive to negotiation, and submitted a new bid based <br />on the revised work writeup. This bid was reviewed and found to be within the <br />acceptable tolerance range of our in-house estimate. With this in hand along <br />with the bids for the mold remediation and lead-based paint work it was decided <br />to proceed with the next steps of the project approval process. <br />• O:WousingRehablCoungrlBumetfie\GerteralConstruc~iontMEMORANDUM.rehab bld procsss.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.