Browse
Search
NS Housing Rehabilitation Contract Award
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2007
>
NS Housing Rehabilitation Contract Award
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2011 9:51:57 AM
Creation date
6/16/2009 11:15:02 AM
Metadata
Fields
Template:
BOCC
Date
3/27/2007
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
5h
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Name: Alvin and Lorainne Burnette Page 2 of 5 ~ 5 <br />Address: 104 Glosson Circle <br />City: Cazrboro <br />Phone #: 929-6458 <br />Date: <br />This set of work specifications outlines work items that were found to contain lead in <br />concentrations above acceptable levels as set in the U. S. Department of Housing and Urban <br />Development (HUD) standards. It is recommended that any lead hazard remediation work be <br />conducted by workers who aze, certified by the state to perform lead abatement work. <br />Lead hazard remediation work must be preformed in compliance with the regulations issued <br />by the Secretary of Housing and Urban Development set forth in 24 CFR Part 35, et al and <br />all applicable rules and any others issued thereunder, and all applicable Federal, State and- <br />local rules and regulations, regarding notification, evaluation and reduction of lead-based <br />paint hazards in residential str-uctures undergoing Federally-assisted construction or <br />rehabilitation and require the elimination of lead-based paint hazards. Every contractor or <br />subcontractor, including painting, pursuant to which such Federally-assisted construction or <br />rehabilitation is performed, shall include appropriate provisions complying with requirements <br />for notification, evaluation and reduction oflead-based paint hazards. <br />The contractor shall be allowed to include in the cost of the project the allowable fee for one <br />(1) complete clearance inspection of the remediation work performed. The cost of any <br />additional clearance inspections which may be necessary will be born directly by the <br />• contractor. <br />Contractor must submit a copy of training certification with their bid. <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.