Browse
Search
NS Housing Rehabilitation Contract Award
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2007
>
NS Housing Rehabilitation Contract Award
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2011 9:51:57 AM
Creation date
6/16/2009 11:15:02 AM
Metadata
Fields
Template:
BOCC
Date
3/27/2007
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
5h
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Name: Alvin and Lorainne Burnette Page 12 of 16 <br />Address: 104 Glosson Circle <br />• City: Carrboro <br />Phone #: 929-6458 <br />Date: 9/26/06-- REVISED 1/22/07 <br />3. Prepare new base cabinet and adjacent wall for installation of <br />approximately 9 l.f. of new formica countertop with integrated bullnose <br />and backsplash. Supply and install new formica countertop with <br />integrated bullnose and backsplash, including end caps, complete. <br />4. Prepare new formica countertop and base cabinet for installation of new <br />stainless steel drop-in sink. Supply and install new stainless steel, double- <br />bowl drop-in sink, including proper clamps and sealant, complete. <br />5. Remove existing water supply lines from existing shutoff valves and <br />faucet for sink. Supply and install new supply lines and single-handle <br />control faucet for new sink and restore to proper working order. <br />• 6. Prepare existing subfloor for installation of new luaun plywood <br />underlayment. Supply and install new %." luaun underlayment, stapled to <br />subflooring, with a smooth top suuface, and prepare for installation of new <br />vinyl floor cover. Supply and install new wood baseboard on laundry wall <br />and in pantry where existing was removed. Supply and install new vinyl <br />floor cover per Owner selection, and new wood shoe mold, complete. <br />Includes new metal transition strip at adjacent Living Room floor cover. <br />New materials to match existing as close as practical. <br /> <br />7. Fully prepare painted surfaces in Kitchen, including walls, ceiling, trim, <br />baseboard and shoe mold ready to receive new paint. Includes patch and <br />repair of sheetrock holes and surface cracks and prime all new or "raw" <br />materials. Paint walls, ceiling, trim, baseboard including new baseboard <br />in Pantry and shoe mold with interior latex enamel semi-gloss finish paint <br />and restore to proper working order. New materials to match existing as <br />close practical. Color per Owner selection. <br />III. BATHROOM <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.