Browse
Search
NS Housing Rehabilitation Contract Award
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2007
>
NS Housing Rehabilitation Contract Award
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2011 9:51:57 AM
Creation date
6/16/2009 11:15:02 AM
Metadata
Fields
Template:
BOCC
Date
3/27/2007
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
5h
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Name: Alvin and Lorainne Burnette <br />Address: 104 Glosson Circle <br />Page 11 of 16 I <br />City: Carrboro <br />Phone #: 929-6458 <br />Date: 9/26/06- REVISED 1/22/07 <br />on rear and left sides. Landing to extend approximately 4" into storage <br />room to create surface for threshold of new storage room door. Ramp to <br />have 36" clear width and extend minimum 18 l.f. from rear edge of <br />landing straight out toward rear yard and have railings on both sides, with <br />railing posts to be set in concrete, with top of handrail set at 34" above <br />ramp top surface. Top of landing handrail to be set at 34" above landing <br />top surface. Step to have 36" clear width measured from rear exterior wall <br />of house and have railing on right side, with top of handrail set at 34" <br />above nose of step. All work complete. <br /> <br />4. Remove vines and other growth from exterior siding of house. Trim <br />height of shrub in front of house to 12" below eave. <br />II. KITCHEN <br />1. Remove existing wall-mounted fan above stove. Prepare wall above <br />existing stove to accommodate installation of new wall cabinet and ducted <br />range hood. Range hood to be ducted through new wall cabinet and <br />existing ceiling through roof to the exterior of the house. Ceiling <br />treatment to be moistened and contained where hole is cut far ducting to <br />not spread dust and debris. Supply and install new 30" wide wall cabinet. <br />New cabinet to be installed with top of cabinet flush with Kitchen ceiling. <br />Supply and install new duct chase through inside of new wall cabinet, <br />remaining space to have shelves. <br />2. Remove existing wall cabinets. Prepare existing wall for installation of <br />new base and wall cabinets. Supply and install approximately 9 l.f. of new <br />base cabinets and approximately lOl.f. of new wall cabinets, properly <br />secured with screws anchored into studs, including all necessary hardware, <br />drawer handles and door handles, complete. <br />~i <br /> <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.