Browse
Search
NS Housing Rehabilitation Contract Award
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2007
>
NS Housing Rehabilitation Contract Award
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2011 9:51:57 AM
Creation date
6/16/2009 11:15:02 AM
Metadata
Fields
Template:
BOCC
Date
3/27/2007
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
5h
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i~. <br />Name: Alvin and Lorainne Burnette Page 10 of 1G <br />-Address: 104 Glossop Circle <br />City: Carrboro <br />Phone #: 929-6458 <br />Date: 9/26/06- REVISED 1/22/07 <br />2. Supply and install new pre-finished white wrought iron railing on left end <br />of porch properly secured to existing left front corner wrought iron <br />column and exterior brick siding of house. Supply and install new pre- <br />finished white wrought iron railing on left and right sides of front steps, <br />properly secured to existing wrought iron columns at top and set in <br />concrete at bottom, complete. <br />3. Remove existing crawlspace access door panel and framing. at Left side <br />foundation wall to accommodate installation of new access door. Supply <br />and install new framing and new access door framed and cross-braced <br />with 2 x 4 treated lumber and '/a" treated plywood face, including door <br />stop, galvanized metal hinges, locking hasp and lock complete. <br />4. Supply and install new address numbers on exterior of house near front <br />door and visible from the street. <br />N. SITE IMPROVEMENTS <br />1. Supply and install underground drainpipe far gutter downspout on rear <br />corner of house adjacent to rear landing, to slope away from house and <br />around storage room terminate or "daylight" at least 10 l.f. down-slope <br />from downslope side of ramp. Includes trenching, direct connection from <br />gutter downspout to drainpipe, backfill, and restore trench areas to original <br />working order as. close as is practical. All connectors and drain pipe to be <br />solid flexible material. All work complete. <br />2. Supply and install landing and access ramp outside of rear exterior door, <br />including handrails, and one step to left of landing, constructed with <br />treated wood members, complete. Landing to be approximately 5' x 5' <br />clear space and constructed over existing concrete porch and have railings <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.