Browse
Search
NS Housing Rehabilitation Contract Award
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2007
>
NS Housing Rehabilitation Contract Award
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2011 9:51:57 AM
Creation date
6/16/2009 11:15:02 AM
Metadata
Fields
Template:
BOCC
Date
3/27/2007
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
5h
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.i ~ <br />Name: Alvin and L.orainne Barnette Page 9 of 16 <br />Address: 104 Glossop Circle <br />City: Carrboro <br />Phone #: 929-6458 <br />Date: 9/26/06- REVISED 1/22/07 <br />K. EXTERIOR PAINTING <br />1. <br />Fully prepare existing dormer siding, gable vents, soffits, frieze boards, rake eaves, rear c <br />paint. Finish paint shall provide sufficient coverage to prevent previous <br />colors from showing through. Protect glass, masonry, concrete, roof <br />coverings, vegetation and personal possessions with appropriate temporary <br />coverings and enclost~res.$ <br />L. STORAGE ROOM <br />1. Remove existing storage room door panel and door stop, remaining frame <br />and casing to remain intact. Prepare opening to maintain existing head <br />height and door swing, accommodate extension of new landing <br />approximately 4" into door opening, and accommodate installation of new <br />exterior door panel, door stop and door threshold. Supply and install new <br />door panel, door stop and door threshold. Includes all hardware and new <br />keyed lockset, complete. Where exterior wood frame, trim and sill are <br />exposed, supply and install pre-finished white aluminum coil stock to <br />cover exposed wood components, including wood spacers to create <br />uniform surfaces. <br /> <br />2. Remove approximately 2 l.f. of damaged sill adjacent to storage room <br />door and approximately 18 l.f. of damaged siding on exterior of storage <br />room. Replace sill and siding with treated wood, plane of exterior surface <br />of siding to match existing. Supply and install new fascia on rear of <br />storage room, primed with oil-based primer. <br />M. GENERAL REPAIRS <br />1. Remove existing tread surface brick from three steps at front porch. <br />Prepare footing/base to accommodate installation of new tread surface <br />brick to match existing rise and run. Supply and install new brick and <br />mortar tread surface brick on the three steps and restore to proper working <br />order, complete. New materials to match existing as close as practical. <br /> <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.