Browse
Search
NS Housing Rehabilitation Contract Award
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2007
>
NS Housing Rehabilitation Contract Award
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2011 9:51:57 AM
Creation date
6/16/2009 11:15:02 AM
Metadata
Fields
Template:
BOCC
Date
3/27/2007
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
5h
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.~~ , <br />Name: Alvin and Lorainne Burnette Page 3 of 16 <br />Address: 104 Glosson Circle <br />City: Carrboro <br />Phone #: 929-6458 • <br />Date: 9/26/06-- REVISED 1/22/0? <br />transition from composition shingle on house, complete. Style and color <br />to match existing as close as practical. Contractor to supply owner with <br />written warranty for materials and labor. All work to code. <br />2. Supply and install new white pre-painted metal Ogee style gutters on <br />house and storage room with at least one downspout for each gutter and <br />one downspout .for every 30' of gutter. Supply and install new gutter <br />guards on all gutters. Each grade level downspout shall have a splash <br />block to divert water away from house, except right rear corner downspout <br />adjacent to rear landing which is to tie-in to new French drain pipe. <br /> <br />D. PLUMBING <br />1. Properly disconnect and remove existing cast iron drain line from <br />Bathroom/Kitchen underfloor hub connection to joint adjacent to where <br />line enters soil, including existing vent line through roof. Supply and <br />install new PVC drain line and vent at same locations, including proper <br />connection to Bathroom, Kitchen and Laundry drains, proper slope, strap <br />hangers, cleanout, and connection to remaining cast iron line at soil. <br />Includes repair leak in existing plastic tub drain line and restore to proper <br />working order. <br /> <br />2. Move accumulated loose soil away from existing water heater. Supply <br />and install overflow pipe on existing water heater, to run from PTR valve <br />directly to soil below. Supply and install new expansion tank, including <br />all necessary connections and fittings, complete. <br />. $ <br />3. Prepare existing wall opening and plumbing behind washing machine in <br />Kitchen to accommodate installation of new washing machine box. <br />Supply and install new washing machine box, including tie-in and <br />
The URL can be used to link to this page
Your browser does not support the video tag.