Orange County NC Website
~S. <br />t <br />UNIT PRICES• <br />A. Unit Prices: Unit Prices quoted and accepted shall apply <br />throughout the life of the contract, except as otherwise <br />specifically noted. Unit prices shall be applied, as <br />appropriate, to compute the total value of changes in scope <br />of the work - all in accordance with the Contract Documents. <br />Unit prices are net and no profit or overhead shall be added <br />or deducted when applying unit prices. <br />B. The Bidder shall state in the following spaces any and all <br />unit-prices applicable to his work and these prices will <br />govern in the event of the addition to or deletion from the <br />Contract Documents. <br />C. Unit Price includes installation of items priced. <br />D. Please refer to section 01020 Schedule of Allowances for Base Bid <br />quantities. <br />MOBILIZATION .............................$ 6~(It~ d. ~' <br />DEMOBILIZATION ............................$ y.l~OD.`~=' <br />SITEWORK <br />TOPSOIL ......................................$ ~~ ~'/CY <br />SPRIGGING ...................................$ e~ ~ /SF <br />SODDING .....................................$ ..S b /SF <br />IRRIGATION INSTALLATION: <br />IRRIGATION PIPING ...........................$ . °d /LF <br />IRRIGATION SPRINKLER HEADS ..................$ E~O.~ /EA <br />IRRIGATION VALVES ...........................$ ~G-~/EA <br />2" SAND .......................................$ O~~/AC <br />1/2" COMPOST ..................................$~ //.~Odr~AC <br />SP - 3 <br />