Orange County NC Website
UNIT PRICES• <br />A. Unit Prices: Unit Prices quoted and accepted shall apply <br />throughout the life of the contract, except as otherwise <br />specifically noted. Unit prices shall be applied, as - <br />appropriate, to compute the total value of changes in scope <br />of the work - all in accordance with the Contract Documents. <br />Unit prices are net and no profit or overhead shall be added <br />or deducted when applying unit prices. <br />B. The Bidder shall state in the following spaces any and all <br />unit prices applicable to his work and these prices will <br />govern in the event of the addition to or deletion from the <br />Contract Documents. <br />C. Unit Price includes installation of items priced. <br />D. Please refer to section 01020 Schedule of Allowances for Base Bid <br />quantities. <br />MOBILIZATION.............................$ 6.00 O, 4-1 <br />DEMOBILIZATION ..... ... ...... . $ H. t)OD `�- <br />...... ... .... . <br />SITEWORK <br />TOPSOIL........ ..............................$ y� �' /CY <br />SPRIGGING ... ................................ $_ a /SF <br />SODDING....... ..............................$ .S 6 /SF <br />IRRIGATION INSTALLATION: <br />IRRIGATIONPIPING ........................... °a /LF <br />IRRIGATION SPRINKLER HEADS .................. 60. /EA <br />IRRIGATION VALVES ........................... a-alp- /EA <br />2" SAND ....................................... $ D6� /AC <br />1/2" COMPOST ..... ............................. 000. 6&IAC <br />SP - 3 <br />