Orange County NC Website
is <br />NORTH CAROLINA <br />ORANGE COUNTY <br />AGREEMENT FOR COMMISSION OF PUBLIC ART WORK <br />THIS AGREEMENT, made and entered by and between ORANGE COUNTY (the "County") <br />and MICHAEL WALLER and LEAH FOUSHEE dba WALLERFOUSHEE STUDIOS, LLC <br />(the "Artist Team") residing at 4508 Saint Mary's Road, Hillsborough, NC 27278, (collectively <br />the "Parties"). <br />WITNESSETH <br />WHEREAS, on November 26, 2008, a Public Art Selection Committee (the "Committee") was <br />convened by the Orange County Arts Commission (the "Commission"), and <br />WHEREAS, the Committee proposed to select Michael Waller and Leah Foushee to design, <br />fabricate, deliver, and install an outdoor sculpture at the new Orange County Public Library, <br />Margaret Lane, Hillsborough, NC (the "Site"), and <br />WHEREAS, the Orange County Arts Commission approved of the recommendation by this artist <br />selection committee, and <br />WHEREAS, on June 16, 2009, after a review of public comments, the Board of County <br />Commissioners approved of Michael Waller and Leah Foushee's design proposal (the "General <br />Design Concept"), <br />NOW, THEREFORE, based upon the mutual promises contained herein and other valid and <br />sufficient consideration, the parties agree as follows: <br />ARTICLE 1. DESIGN DEVELOPMENT <br />a. Artist Team will have a maximum of (30) days after execution of this Agreement to <br />refine and add details to the General Design Concept in collaboration with the Parties <br />and input from the citizens of the Site community, and complete a fully developed <br />design proposal, which shall consist of a project budget, scaled drawings, a written <br />statement describing the concept for the public art, material samples, samples of <br />coatings and finishes, a tentative fabrication and delivery schedule, steps for installing <br />the work at the Site, and maintenance recommendations (the "Fully Developed <br />Design Proposal"). The fabrication and delivery schedule shall provide for progress <br />reports at 50%, and 100% completion of fabrication, include photographs and other <br />images of the public- art, and require delivery to, and installation of the public art at, <br />the Site before the end of April, 2010. <br />b. The Committee and/or the Hillsborough Historic District shall review the Fully <br />Developed Design Proposal by the Artist Team. The Committee and/or the <br />Hillsborough Historic District may either accept the Fully Developed Design <br />Proposal, or request that the Artist Team develop a second proposal within a <br />reasonable timeframe, not exceeding thirty (30) days. <br />c. In the event that a second Fully Developed Design Proposal is not accepted by the <br />Committee and/or the Hillsborough Historic District, the Artist Team and the County <br />will have the option to terminate this Agreement or develop a third design proposal <br />