Browse
Search
Agenda - 06-16-2009 - 4h
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2009
>
Agenda - 06-16-2009
>
Agenda - 06-16-2009 - 4h
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2009 12:31:40 PM
Creation date
6/12/2009 12:31:39 PM
Metadata
Fields
Template:
BOCC
Date
6/16/2009
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
4h
Document Relationships
Minutes - 20090616
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 <br />CLASS CODE: 2608 <br />FLSA: EXEMPT <br />ORANGE COUNTY, NORTH CAROLINA <br />JOB DESCRIPTION <br />CLASS TITLE: VALUE ENGINEER <br />ASSET MANAGEMENT AND PURCHASING DEPARTMENT <br />GENERAL STATEMENT OF JOB <br />Under general supervision, performs administrative work for the Purchasing and Central Services <br />Department. Work involves leading the design/build teams for County capital building projects, <br />ensuring expected quality of work is performed and adheres to budgetary allocations; assists in <br />long range space and capital project planning; and evaluates building maintenance systems and <br />procedures for effectiveness and efficiency and making recommendations for change as <br />appropriate; serving on the departmental management team; and may serve as acting <br />department director in the absence of the departmental director. Reports to the Director of Asset <br />Management and Purchasing. <br />SPECIFIC DUTIES AND RESPONSIBILITIES <br />ESSENTIAL JOB FUNCTIONS <br />Serves as Capital Project construction, closeout, turnover, and warranty period liaison; serves as <br />stakeholder liaison. <br />Works with design team, which consists of architect, engineers, regulatory agencies, County <br />departments and others who may be involved in the design of a given facility. <br />Ensures completion of required studies at the appropriate point in a project, survey work, and <br />other pre-engineering work; facilitates the completion of all information needed for recordation <br />with the Register of Deeds and/or regulatory agency such as right-of-way and/or encroachment <br />agreements, utility dedications, etc. <br />Performs Capital Project planning; analyzes space planning; assists with identifying facilities to <br />fulfill space plan outcome. <br />Prepares and monitors Capital and Operational Project budget; analyzes variance. <br />Assists with development of the County's Capital Improvement Plan. <br />Designs, reviews, and implements sustainable best practices and standards. <br />Serves on department management team; may assume responsibility when Director is absent. <br />Attends Board of County Commission and/or other regulatory body meetings to support/explain <br />departmental items, which may appear on the agenda. <br />©Archer Company 2009 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.