Orange County NC Website
UNIT PRICES <br />otherwise <br />Unit prices quoted and accepted shall apply throughout the life of the contract, except as <br />specifically noted. Unit prices shall be applied, as appropriate, to compute the total value of changes <br />in the scope of the work all in accordance with the contract documents. <br />Earthwork <br />Removal of Unsuitable Material and Replacement with On -Site Borrow <br />$ LA •1cy <br />Removal of Unsuitable Material and Replacement with Off -Site Borrow <br />$ Q0 Jcy <br />Removal of Unsuitable Material and Replacement with #57 Stone <br />$ O • /cy <br />Trench Rock Excavation and Removal <br />$ O Jcy <br />General Rock Excavation and Removal <br />$ Jcy <br />-Sitework Installation (price based on details provided in construction documents) <br />30" Concrete Curb and Gutter <br />-6' Concrete Curb (18" deep) <br />$ .Af <br />15° Storm Drainage Pipe — RCP — up to 6 feet deep <br />$ 72,. Af <br />• <br />Storm Structure — Drop Inlet — up to 6 feet deep <br />$ 18oe <br />Asphalt Pavement —1 W surface course — S9.5A <br />$ Jsy <br />Asphalt Pavement — 8' — 1325.013 <br />$0 Jsy <br />Reinforced Concrete Pavement — per civil detail <br />$ . /sf <br />6" thick Compacted Aggregate Base Course (NCDOT standard) <br />$ .O•I�O. •lsy <br />W -thick Compacted Aggregate Base Course (NCDOT standard) <br />$ ill' ©0 Jsy <br />#57 Washed Stone <br />$ /ton <br />Architectural Installation <br />Wood Base (per VA8.3) <br />$ 1 O .11f <br />Wood Base (per 5/A8.5) <br />$ 'Af <br />Door 1028 including frame, door, glazing and hardware per Al0.1 <br />$ � 0 Jea <br />Door 124 including frame, door, glazing and hardware per All 0.1 <br />$ 7� •ea <br />-16 °x16' non - rated, steel access door per Specification Section 08305 <br />$ 1 ItC _ lea <br />Partition A3 (13' -G' high) per A2.5 <br />$ f <br />.A <br />Partition C4 (13' -6' high) per A2.5 <br />FP-3 <br />Addendum #7, 2115/07 <br />