Orange County NC Website
ALTERNATES• <br />Should any of the alternates as described in the contract documents be accepted, the amount written <br />below shall be the amount to be "added to" or "deducted from" the base bid. (Strike out "Add" or <br />"Deduct" as appropriate_) <br />Base Bid 'A' Alternates <br />Alternate A -1: Rainwater Collection and Reuse System + (( II <br />Add�_Xl Dollars($) T Z , $ �' <br />Alternate A -2: HVAC EMS Control System <br />(Add) (Deduct) Dollard$) No CMA1 d F <br />Alternate A -3: Exterior Pavilion <br />Add Dollars t OPT <br />Base Bid 'B' Altemates <br />Alternate B -1: Heavy -duty Asphalt Pavement <br />f <br />Dollars($) $� 7 5 0 <br />Alternate B -2: Metal Roofing on Public Market House <br />* 37 q3a <br />Add) A* Dollars <br />Base Bid 'C Alternates <br />Alternate C-1: Pedestrian Bridge over Stillhouse Creek <br />Add)p Dollars($) <br />Plumbing Subcontractor: <br />LJA KF PLvi" 014 Llc <br />Fire Protection Subcontractor: <br />to C ISION Lic Z3 �o$� <br />Mechanical Subcontractor. <br />wa 99ttJ HAY tic -77.11 <br />Electrical Subcontractor. <br />.lc ��Ec rR)c uc t7Zo2= u <br />FP -2 Addendum #7, 2/15107 <br />