Orange County NC Website
Justice Facility Project <br />Summary of Bid <br />Value Engineering Detail <br />Base Bid $9,899, <br />Farmer's Market $196, <br />River Park $85, <br />IternateA-3 Pavillion $62, <br />Total Gross Construction $10,243, <br />Less: <br />ccepted Value Engineering Items: -$166, <br />Total Pro osed Bid Award for construction $10,076, <br />Amount <br />Accepted Value Engineering Items Detail: <br />Mechanically Attached TPO for roof <br />Prefinished 24 gauge metal in lieu of aluminum <br />Staircase with h/m tempered in lieu of firelite <br />Elimination of B' chain link construction fence <br />Revision of C2.0, C3.0 dated 3/26/07 <br />Toilet fixture renovation deletion X113,114,203,204 <br />Cast stone coping in lieu of metal coping <br />Iternative to Carpet/Carpet Tile <br />Use existing supply and return air <br />Ceramic Tile alternative <br />Deletion of air temp sensor inputs <br />PVC waste and vent piping where permissible <br />Total value en ineerin items <br />-$7,018 <br />-$9,703 <br />-$46,452 <br />-$1,375 <br />-$1,156 <br />-$39,447 <br />-$7,743 <br />-$22,978 <br />-$1,500 <br />-$22,340 <br />D <br />• <br />• <br /> <br />