Orange County NC Website
• • • ~• •, <br />Oranl;c County Justice Expansion, Public Market House and River Park <br />t3id Tabulation <br />Bids Received: l~ebruary 22, 2007 <br /> <br />Single-I'ritne _ <br /> <br />General Contractors Alternate A-1 <br /> <br />Rainwater Reuse <br /> <br />System Alternate A-2 <br /> <br />HVAC EMS <br /> <br />Control System <br />Alternate A-3 <br /> <br />Exterior Pavilion Alternate B-l <br /> <br />Heavy-duty <br /> <br />As halt I'avinu <br />Alte-•ttate B-? <br /> <br />Metal Roofing ;~lternatc C'-1 <br /> <br />P(:dcstrian <br /> <br />L3rid~e <br /> <br />13ordcaux Construction `);142,870.00 no change $62,000.00 ~ 1$, i>0.00 X37,930.00 $20,425.00 <br />DeVerc Construction ($185,000.00) S0.00 (~10(i,000.00) ($21,000.00) 032,000.00) 0+30,000.00) <br />T. A. Lo~~ing X352,000.00 ~ 18,000.00 $66,300.00 $19,000.00 $40,000.00 X29,000.00 <br />T7]alle Construction <br />,I. ~~1. "Chompson Co. X231,000.00 ~ 17,500.00 ~ 106,000.00 S 18,200.00 $38, l 00.00 X43,000.00 <br /> <br /> <br />Single-Prime ~ <br />General Contractors Plumbing <br />Subcontractor Fire Protection <br />Subcontractor Mechanical <br />Subcontractor Electrical <br />Subcontractor <br />Bordeaux Construction Wake Precision Warren-Hay JC Electric <br />DrVerc Constnlction Wake Precision Warren-Hay JC Electric. <br />"1". A. Lo~~ing Maybet•ry Precision Comfort Eng. Lewis <br />^l hilllt ~..'on5lrllCtlol] <br />,l. ~-1. ~1~1]rmpson C'u. Southern Piping Precision Comfort Eng. JC Electric <br /> <br /> <br />0 <br />